Electrical Permit — 320 S CANAL ST
Electrical
$3,400,000
Kelso-Burnett Co.
Cook County
Work Description
Self-cert 2019 cbrc: 1st time buildout of office space on the 40th floor of an existing office building. new partitions, electrical, plumbing, and ventilation work, as per plans. (occupancy group b; type 1a construction)
Other permits at this address
6 other permits at 320 S CANAL ST. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Self-cert 2019 cbc: 1st time buildout of common corridors and elevator lobbies on the 22nd, 38th, & 40th floors of an existing office building. new partitions, electrical and ventilation work, as per...
Fire alarm: modification of existing system. associated building permit:101075325. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special lockin...
Self-cert 2019 cbc: 1st time buildout of the 45th floor of an existing office building, for a new tenant, as per plans. (stuctural peer review) (occupancy group b; type 1a construction)
For permit 101075325: replacement electrical contractor. new contractor(s) listed under "other applicants and contractors" on permit certificate.
Low voltage/communication electrical work. install data/video. specific location: 28th floor.
Low voltage/communication electrical work. install audio. specific location: 25th floor.
More Electrical permits in Chicago
Spr 2019 cbc: interior renovation to an exist. single-family frame/masonryresidence. repair exist. rear wood deck, upgrade to exist. mechanical,electrical and plumbing. (occupancy group r-5 type iiia...
Scope: nonstructural interior repair/replacement of drywall, electrical, plumbing and finishes due to fire damage. locations: 1 residential unit(s), 0 non-residential unit(s), throughout sfr
Self-cert 2019 cbrc: interior alterations in existing office building on the 27th floor, to exiting full floor office suite 2750, interior partitions, millwork, finishes, electrical mechanical and plu...
Scope: nonstructural interior replacement of electrical, plumbing and finishes. locations: 1 residential unit(s), 0 non-residential unit(s), 1st floor only
Line voltage electrical work. add 3 circuits to existing 100 amp service disconnecting means. receptacle outlets: 15 . lighting outlets: 28. specific location: basement.