Other Permit — 370 7 AVENUE
Other
$200,000
Universal Mgmt & Cont Cor
Barry Zimmerman
New York County
Work Description
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Other permits at this address
10 other permits at 370 7 AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy.
Interior renovation to include demo of existing and construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Interior renovation to include demolition of existing partitions and finishes as shown on plans. No change in use, egress, or occupancy.
Interior renovation to include demolition of existing partitions and finishes as shown on plans. No change in use, egress, or occupancy.
mechanical work as shown on plans filed herewith. No chance in use, egress or occupancy.
Extension of passanger elevator #4 with two additional stops: oneat the 17th fl (construction) and one at the roof level. newassociated emr and access stairs. new vestibule and toilet roomwhitebox at...
Extension of passanger elevator #4 with two additional stops: oneat the 17th fl (construction) and one at the roof level. newassociated emr and access stairs. new vestibule and toilet roomwhitebox at...
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel