HVAC
Not listed
San Diego County
Standard- Dry Utilities:4173/University - WYYER FIBER: Public Right of Way Permit - Construction plans for public improvements, including trenching, boring, removing and replacing sidewalk, removing material 12"-16" clearance from all around the vault, and placing the new vault on 6"-8" of crushed rock bedding. Crushed rock to be 1/2" in diameter. Reinstall the lid to the base of the vault prior to uniformly backfilling on all four sides. Vault lid to be flush & leveled with the existing grade of the landscape. Proper tamping tools, such as a mechanical tamping device or a hand-operated device, should be used to compact earth/rock backfill material. Compacts backfill per engineering specifications, white book section 301-1.3 & to 95% compaction. MID-CITY: CITY HEIGHTS: CC-5-4, CD9.
kzKcmG HYeTN filed a hvac permit at 4173 1/3 University Av, San Diego, CA with no contractor listed.
1 other permit at 4173 1/3 University Av, San Diego, CA. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
General-Express-Building Construction:4520/Executive - UNIVERSITY. Building, mechanical, electrical, & plumbing permits for proposed tenant improvement to (E) office building. Scope of work to include...
General-Express-Building Construction:4525/La Jolla Village - UNIVERSITY: Building, Electrical, Mechanical and Plumbing permits for the proposed remodel of existing retail space for new electric car s...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com