Roofing Permit — 4360 BROADWAY
Roofing
$1,256,387
Neelam Construction Corp
Dean Johanson
New York County
Work Description
Structural work to support electrification project at the building. Includes new steel rooftop dunnage and new slab openings for MEP runs.
Other permits at this address
10 other permits at 4360 BROADWAY. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Structural work to support electrification project at the building. Includes new steel rooftop dunnage and new slab openings for MEP runs.
The installation of a new ConEdison transformer vault. Electrical service from the vault to the building including trenching and site restoration.
Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replac...
Shoring of Underground Utilities
Shoring of Underground Utilities
The installation of a new ConEdison transformer vault. Electrical service from the vault to the building including trenching and site restoration.
Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replac...
Soe/ps48m - for support of excavation submitting on behalf of contractor, related with dob # m00984880, .no change in use, occupancy or egress
Soe/ps48m - for support of excavation submitting on behalf of contractor, related with dob # m00984880, .no change in use, occupancy or egress
Drawings are for sprinkler work only. System designed per NFPA 13 and BC Appendix Q. Remove and replace existing stage deluge system up to isolation valve. Replace all sprinkler heads and reconnect DC...
More Roofing permits in Manhattan
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m00972936.
CONSTRUCTION OF NEW ACCESS STAIR, LOUVERED SCREEN AND RAILING ON ELEVATED STEEL PLATFORM ON UPPER AND LOWER LEVELS.NEW GRATING ON LOWER LEVEL OF TANK PLATFORM AND NEW GRATING ON UPPER LEVEL OF TANK PL...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east at 102 &110 & 108 &...
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existing platform on the r...