Addition and/or Alteration - Install a new 200-amp electrical service and panelboard, including service conductors, disconnecting means, and proper grounding and bonding.
Provide complete electrical distribution throughout the space, including installation of lighting fixtures, receptacle outlets, switches, exit signs, and emergency lighting in accordance with the approved plans. Install dedicated branch circuits for the water heater, air conditioning equipment, and heat pump, including all required wiring, overcurrent protection, and terminations. Provide feeder and install subpanel to serve the second floor.
Install all required branch circuits for lighting and receptacle outlets as indicated on the plans. All work shall be performed in accordance with the 2017 NEC and per approved plans.