HVAC
$2,000
Hage Construction Co
Hennepin County
SFD
$139.06
Ericsson
Addition
remove and replace side entrance steps Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. Stairs: 7 3/4 maxim
INSTALL STRUCTURAL SUPPLEMENT engineer: 54808 - Nevison, Patrick Richard Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUM...
Installed new 1.5 ton mini split system for room 23- Data room in lower level. Condensing unit located in back alley, Sitting on wall bracket. (The applicant has been notified the height cannot exceed...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com