ADU
$126,880
Stephanie S.
San Diego County
Rapid Review-Standard-Building Construction:4825/Hawley - **Scope Change 08/28/2025** MID-CITY: NORMAL HEIGHTS; Combination Building Permit for a proposed partial garage/storage-to-ADU conversion on the first floor of an existing 2-story building with an existing SDU above, and accessory to an existing detached SDU. The new ADU will consist of (2) bedrooms, (2) bathrooms, living room, and kitchen. The remaining garage will be reconfigured and include a new storage room. No proposed increase to the building footprint or structural envelope.
Stephanie S. filed a adu permit at 4829 Hawley Bl, San Diego, CA with no contractor listed.
Non-DCE-Standard- Standalone:4271/J - SOUTHEASTERN SAN DIEGO: Right of way permit for proposed work to include new water service, new fire service and residential driveway for an existing SDU and 4 pr...
General-Standard-Building Construction:8021/Jamacha - SKYLINE-PARADISE HILLS: Combination building for a proposed (N) detached 1-story ADU and a (N) covered porch to an (E) 1-story SDU. (VHFSZ).