Chicago, IL
Chicago · IL
Chicago · IL
2019 cbrc: interior renovation of existing 5,180 square foot 1st floor (former office space) and 8,813 square foot unfinished basement to create a fitness studio. work includes demolition and lowering of existing basement slab, new partitions, finishes, mep systems, and installation of a new nfpa 13 sprinkler system throughout the work area. change of occupancy from business (group b) to assembly (group a-3). no change in building height or area. (occupancy group a-3; type iii-a construction; work area fully sprinklered).
Scope: nonstructural preparatory demolition of non-load bearing partitions and m.e.p. systems with demo drawings and all other work to be performed on spr application/permit #10108…
Interior alterations to existing office space on the 33rd floor of a high rise building in the central business district. the scope of work includes demolition of non-load bearing…