HVAC
$1,500,000
San Francisco County
Financial District/South Beach
4th floor tenant improvement, demolition of existing non-partitions, doors, frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped at source. construction of new non-structural partitions, finishes, ceiling,
5 other permits at San Francisco, CA. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
4th flr - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be capped...
16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be cap...
4th flr - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be capped...
revision 202601153931- unit 1- repalce sheetrock and inuslation, relocate furnace and water heaters in garage. rewire garage and fixtures for unit 1. separate permit for remodelling unit 1