Manhattan, NY
Manhattan · NY
Manhattan · NY
General construction consisting of non-load bearing partitions to tenth floor as per plans filed herewith. no change to use, egress or occupancy.
Modifying heads to accommodate the new separation wall between buildings. Creating a new bypass loop at the location of the building separation on the 2nd Floor. Connecting the exi…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…