5737 Temple Rd
Nashville · TN · 37221
Nashville · TN · 37221
Disable the existing EPDM roof membrane and leave in place, remove existing wall flashings, penetration flashings, perimeter trims, and gutter system. Mechanically attach (1) layer of 1” Polyisocyanurate Insulation cover board over the existing EPDM membrane to meet manufacturer specification. Install ¼” per foot tapered insulation as needed at the high side of the HVAC units to provide positive drainage.
To install a fiberglass pool with tanning ledge located to the rear of an existing single-family dwelling. RS20 Zoning. corner parcel. 20' min rear s/b; 10' min interior side s/b p…
To reroof the existing single family residence. no change to building footprint. home is to remain single family. the holder of this permit hereby certifies that all construction a…