City Funded Demolition 1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 90 days from award date.
3. ACHD asbestos application required – Survey included 4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures. 6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing. 7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Lowest Combined Bid With: 1041 Shreve, 911 South Side, 63 Royal, 67 Royal, 35 Woessner, 37 Woessner, 57 Lareda & 1320 Itin 9. City regulations limit demolition work to the hours of 7 a.m. through 8 p.m.
10. Foundation Walls Remain