Addition and/or Alteration - SERVICE UPGRADE
- Shut down power at panel and remove
meter.
- Disconnect taps and remove 100 amp
service cable, meter socket.
- Remove service cable from 100A main
breaker panel.
- Remove 100A main breaker panel.
- Supply and install 200 Amp service cable,
PVC weather head strap securely to building
and to new disconnect and meter socket.
- Supply and install a 200 Amp aerial fed
meter socket with weather-proof hub.
- Supply and install a 200 amp, 40 space,
main breaker load center
- Supply wiring from new meter socket to
main breaker of new load center panel.
- Supply all required bonding and grounding
of new service.
- Supply and install all required branch circuit
breakers.
- Make all mains and branch circuit
terminations.
- Identify circuits and place panel schedule.
- Prepare a drip leg and make insulated
splice connection to Peco feeders.
- Re-install meter into socket, energize and
test circuits.