Manhattan, NY
Manhattan · NY
Manhattan · NY
Replace (2) gas-fired boilers as per plans. no change to use, occupancy or egress
Modifications to the existing HVAC system on the 37th and 38th floors (Mirae) as per plans. No change to use, egress or occupancy.