HVAC
Not listed
San Diego County
Standard- Dry Utilities:945/Hollister - WYYERD FIBER: Public Right of Way Permit – Construction plans for public improvements, including removal of material 12"-16" clearance from all around Vault, place vault on 6"-8" of crushed rock bedding. Crushed Rock to be 1/2" in diameter, reinstall the lid to the base of the vault prior to uniformly backfilling on all four sides. The vault lid should be flush & leveled with the existing grade of the landscape. Proper tamping tools, such as a mechanical tamping Device or a hand-operated device, should be used to compact the earth/rock backfill material. Compacts backfill according to engineering specifications, as outlined in the White Book, Section 301-1.3 & to 95% compaction. OTAY MESA NESTOR: CC-1-3, CV-1-1, CD8. ALUCOZ: Imperial Beach; NOLF Brown Field.
BbGkyS LJSbv filed a hvac permit at 945 1/3 Hollister St, San Diego, CA with no contractor listed.
General-Express-Building Construction:4520/Executive - UNIVERSITY. Building, mechanical, electrical, & plumbing permits for proposed tenant improvement to (E) office building. Scope of work to include...
General-Express-Building Construction:4525/La Jolla Village - UNIVERSITY: Building, Electrical, Mechanical and Plumbing permits for the proposed remodel of existing retail space for new electric car s...
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com