Kitchen/bathroom remodel for residential buildings (no structural changes)MECHANICAL, ELECTRICAL, AND PLUMBING INCLUDED 7 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residentialbuildings, three stories or less, per Section 150.2(b) 1B of Title 24.7"COMPLY WITH DEPARTMENT ORDER effective date03/27/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Allpermits shall be for the same time period limitation. Ifadditional assistance is needed, please call Inspector GABRIELHERRERA at (213)252-3949 of CONTRACT NUISANCE ABATEMENT. CEISCase Number is 999612.(Created: IMSV7 / 03-21-24)