1 Kitchen 1 bathroom remodel for residential buildings (no structural changes) 6 Window and 4 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150(b) 1B of Title 24. Re-stucco for residential buildings. Including Mechanical. electrical and Plumbing "COMPLY WITH DEPARTMENT ORDER effective date08/20/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Allpermits shall be for the same time period limitation. Ifadditional assistance is needed, please call Inspector AUGUSTUSALBAS at (213)252-3038 of GENERAL ENFORCEMENT CENTRAL.