259 issued permits in Castro/Upper Market, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
259 permits
replace fire alarm to meet sf/ca code and add lf horns in units and add radio monitor.
kitchen remodeling (like for like) & 2 windows replacement (like for like), windows are not visible from street.
1) new partitions walls and doors for massage rooms. 2) replace restroom door. 3) replace lavatory 4) new window above the storefront. 5) relocate door operators 6) new storefront…
to obtain final inspection for work approved under pa #2024-0723-7096. all work is complete.
kitchen remodel including wall removal and new beams within unit 129 of the existing duplex residence.
rev 201908229595. additionally, units 1, 2, 3 and 4 relocation of kitchens, addition of 2 bathrooms, relocation of 4 existing bathrooms and general seismic upgrade. replacement of…
revision to pa #202501228791: t.i - enlarge (e) kitchen, add bar on 1/f, add ada accessible bathrooms on 1/f
unit#22: remodel kitchen and bath in small apartment, no change to location of kitchen or bath, upgrade electrical in unit with new plugs/lighting
reroofing: tear-off (e) roof system and installl 3ply modified bitumen roof system. torch down. 800 sq ft.
recommencement and completion of work approved under pa#202412096401
upgrade e fire alarm system to comply with sffc section 1103.7.6.1 to meet 75 db in all sleeping areas
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
replace wood siding from the back of property, approx 1500 sq ft. new materials. install new hardie plank lap siding, replace 11 windows (uf<=0.27), new anderson single hung and 2…
interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen.
four dry stacked stone retaining walls (wall d, e, f, g) of varying heights. walls are primary a mix of a2 flagstone & connecticut bluestone w/ riverstone & onxy accents.
evacuation signage for pa202402296854.
unit 457 1/2: remodel bathroom and kitchen. install insulation and new drywall. new electrical and plumbing. replace gas line. replace existing hvac.
remove pony wall and relocate it at bar to make ada accessible.