751 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
751 permits
6th floor:ref permit#202603117365, defered mep, demo, install new & relocate existing ductwork & air terminals, relocate & reuse existing vav boxes. electrical lighting fixtures &…
fire alarm as builts - orig fa permit 202501279152, addendum 202508153130. remove fsd and dual monitor / control modules per approved mechanical drawings and field condition
6th flr hallway: install 100 sf of 5/8 drywall (2' flood cut) in front of unit 601. work is seperate from 202601083457 due to water damage.
lobby renovation: interior improvement to the lobby of (e) residential building. scope includes: demolition of (e) walls and finishes, construction of new enclosed leasing office (…
12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture qua…
level 15: as built to permit 202601284684. plugged 2 sprinklers. relocate 64 uprights. add 3 uprights. relocate 32 pendents. add 5 pendents. total 104.
1st/f: deffered interior only added project scope to pa# 202510288253, 202510248150, 202510207678: barrier removal only at ground fl shower rooms
10th fl - interior scope includes demo of select light fixtures power poles, non-structural walls, partitions, and doors. install of new non-structural partitions, doors, new equip…
ground floor ti for suite 1500 to include restroom on 1st floor of an (e) 6 story building. non structural demo, partitions, and (n) act ceiling tile and lighting fixtures, (n) and…
pa#: 202603117343. deferred mech and elect permit.mech demo + install new + relocate existing duct work =air terminals relocate + reuse existing vav boxes. demo and reconnect heati…
4th fl - ti @ existing fitness center to include demo & construction to create fitness studio. new washer/dryer @ storage 0413. mep under separate permit
15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately.
ti to include (n) non load bearing partitions, storage racks, furniture, equipment, lighting, and millwork. (n) accessible fitting room, restroom and drinking fountain
7th floor: revision to 202602095508: relocate 21 ssu, convert 11 ssu to ssp, added 6 ssu. gct#202512030811
level 40: defered mep for bpa#202512172045
install new electric internally illuminated channel letter address sign (201)
22/fl- demo of office space to remove paritions, breakroom area, glass office fronts, and light fixtures only. ti will be on separate permit
29th/f: deferred mep for t.i. 202512101397
voluntary replacement of (e), currently functioning, obsolete fire alarm control units (facu). internal components are being replaced. (e) cabinets back boxes shall remain as-is an…
11th office partial remodel/retrofit. lighting fixtures & associated circuiting/contros, power & signal devices and associated wiring, including for phone booths. ref 202510318678