746 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
746 permits
#304: revision to pa#202602176000: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.
unit 2216: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.
23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or squar…
#809:rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.
5/fl-(n) interior ti to include mechanical and electrical . structrual for movable wall. includes mep work
basement and 2nd flr - new power and signal devices in space. ref#: 202512222436 and 202512192339. (electrical sheets)
safe off controls vavs and ddc controls. reconfigure duct work to match new partition plan. furnish and install galvanized steel duct distribution. furnish and install grilles, reg…
basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this pe…
4th fl - ti include demo of non-structural partitions and building new non-structural partition. all new or revised. meps and life safety work will be design build and submitted se…
ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.
43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, gla…
new fire smoke dampers and power ref approved mech permit: 202602236308.
15th fl - provide new lighting @ ste 1500 ref pa 202510026577
4/fl- ref 202603036842 - deferred mep
selective demolition of non-structural interior elements, including interior portions, doors, ceilings, lighting, mechanical & electrical, and finishes. new construction scope incl…
ste 300 & 305 a demising wall was shifted between the two suites just a bit and one office in suite 305 was omitted
31/f: fire alarm - tenant improvement - as built. per sffd walling comment on building job card pa# 202508203550 & fire permit 202510157411. as built drawing are needed, with the a…
scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.
floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17
2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mech…