746 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
746 permits
level 25. revision#: 202512302947. upgrade elevator lobby hardware. delete ada counter in bathroom. relocate power location for printer. minor ada bathroom updates.
waterproofing front of building including caulking and sealing.
relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas…
24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160
5/f: new phone booths added to (e) space.
office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.
1 aluminum illuminated/electrical, 2 face sign. sign name as "chalk"
10th floor. electrical new power and signal device throughout the space. new 2022 title 24 compliant lighting and controls. ref 202507110614
1st floor: furnish and install (1) heat pump unit. furnish and install associated ductwork and air registers/diffusers. ref# 2026-0218-6079.
6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct
level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331)
revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931
revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilings
unit # 511 w 5th floor: remodel kitchen, change bath to shower. move sink to opposite side in kitchen. removal end wall to dining room and make it a ponywall. no exterior work.
level 2, suite 210. demo e and construct new non structural partitons, finishes,millwork, ceilings. no exterior or structural work. mep deferred
5th floor: interior tenant improvement work including selective non-strucutral demolition and new interior construction. scope includes new partitions, ceilings, lighting, power/da…
6/fl- as built 202601073398- fire sprinklers updated drawing for adjusted piping plan. ref 202510087015
provision and installation of 4 shield 30 sroiv remote call stations on 8th fl lowrise and midrise elevator lobbies, 21st fl high rise elevator lobby and 29th fl high rise elevator…
interior only 5th floor t.i. remodel existing restrooms. new all gender restroom. renovate entire floor with new offices, open work area, break room and reception area. mep deffere…
floor 25;fire only to obtain "as-built" permit for the fire alarm addtions with the floor 25 allen matkins remodels. initial fire alarm pa#: 202511129336.