232 issued permits in Marina, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
232 permits
1st fl: modify floor plan, relocate bathroom, replace window with french foor, (n) fire rated 1 hr wall. 2nd fl: enlarge kitchen opening. 3rd fl: bathroom addition with shower, (n)…
reroof, no hot work.
skylight installation in primary bathroom. revision to bpa: 2026.0116.4049
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
bathroom remodel in kind like for like (no change tub to shower), 1 kitchen remodel in kind like for like, update electrical, upgrade plumbing.
addition of 2 roof skylights serving an office on 2nd/f, no structural
a unit renovation, a new roof deck (450 sf) at an e) 2 family home
to obtain final inspection for work approved under pa# 202312202862, 202408209063. all work is complete.
solar permit: ballasted: n, including 1 energy storage unit, of 600 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | installing powerwall only 13.5kw…
install temp shoring, consiting of cantilever sodier beams, along locations showns sh2.0 to allow excavation for new development at property.
administrative only: no work under this permit application. permit to prove compliance with eero requirements in section 1031 of cbc for new conditions property by split lot.
revision to pa# 202506068151, reinforce existing lattice support. drill 4 18"x7' deep caseong, furnish & install 4 hss 6"x4"x3/8"x30'. hot dip galvanized steel tubes & pour 2500 sf…
revision to pa #202506149364 to address exisiting conditions. revision include shifting beam along grid d between line 4&6 on 2/s2.0 to grid f; shift beam along grid d between 2 &4…
#310 (1) 60 sf kitchen & (1) 50 sf bathroom remodel. no wall moving; (n) led light fixtures throughout unit. bring wiring to code. no change to layout
unit 203: remodel kitchen and bathroom, no structual work, all fixtures to remain the same, tub to shower conversion.
revision to pa 202411205363 removing the staff room & installing dedicated men & women dressing rooms with 2 showers in each room no changes proposed to exterior
partial remodel of (1) bathroom: new bathroom sink, toilet, and laundry.
re-roofing: removal of old torchdown roof and installation of 1000 sq ft tpo roof
remove rear stairs