102 issued permits in North Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
102 permits
to obtain final inspection for work approved under pa#: 201807245440, 202008061221, and 202103317606. all work is complete.
exploratory demo in floors, walls and ceiling for furture permit set. interior only ~100 sq ft demo.
reroofing hot works
interior renovation, new flooring, cabinets, plumbing trim, electrical trim, paint and flooring, renovation to be like for like in same location, new electrical sub panel to be ins…
deck repair less than 50% like-for-like
to obtain final inspection for work approved under pa# 202208090146. all work is complete.
replace kitchen cabinets and counter in kind.
installation of 3 existing prefabricated exterior awnings mounted to existing building facade per manufacturer specifications (rear of bldg)
remodel an (e) kitchen. remodel an (e) full bath. add a powder room. add a new sub panel.
to obtain final inspection for work approved under pa#202103186807. all work is complete.
revision to 202412176961, outline s the design revisions to door and storefront modificiations, existing door was removed and replaced, delta a changes
revision to pa 202510177628 unit 401 - added gas, plumbing, electrical and intemescent coating to steel beam surface
to obtain final inspection for work approved under pa# 202010247322, 201701268036, 202010035826.
1/fl- replace front doors, add 3 enclosed offices, revise bathrooms and add shower
re-roofing. no hot works.
kitchen and bath remodel in kind, except tub to shower, including plumbing, hvac replacement, and electrical work, install new 60-amp sub panel. kitchen approx 120 sq ft. bathroom…
unit 26: kitchen and bath remodel in kind except tub to shower, including plumbing, hvac replacement, and electrical work, install new 60-amp sub panel. kitchen approx. 120 sq ft.…
kitchen and bath remodel in kind except tub to shower, including plumbing, hvac replacement, and electrical work, innstall new 60-amp sub panel. kitchen approx 120 sq ft. bathroom…
new aluminum clad front window front builing. unit 378 3rd flr. remove wall between living room and bedroom. unit 380 fourth floor: remove wall between living room and office, expa…