114 issued permits in Outer Mission, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
114 permits
repair less than 50% of front stairs in kind like for like.
to obtain final inspection for work approved under pa#202305318877. all work is complete.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
obtain final inspection for work approved under pa#202302021290. all work is complete.
demo existing landing and stairs and build new deck and stairs
bathroom remodel (in kind): only work being done: replace vanity with a single sink. instalation of a new shower inclosure.no other work being done.
modifications to an (e) multi-unit building. convert the (e) 2 car garage into an adu-one bedroom, one bath of 516sf per state adu policy
reroofing. overlay (e) bur reoof with new tpo membrane adhered to (e).
comply with nov #201901041. 2nd fl: enclose the front entry way, new entry door and 2 windows. change front bedroom to dining room.
demo existing retaining wall & cmu fence, add a new permeable & grid apvers ramp for access from street, add new retaining wall between 145 & 149 goethe st.
install (n) blade sign facing street non illuninamted double sided for "namit" sign a
build 2 retaining walls (less than 4 feet from top of wall to bottom of footing), landscape & hardscspe @ rear yard
1)convert an existing storage room (approx 197 sq ft on the ground floor to a bedroom. 2)add a wetbar (approx. 44 sqft). 3)relocate laundry to front of entry.
to obtain final inspection for work approved under pa# 202203250883 & 202502281310. all work is complete.
foundation partial improvements - voluntary. seismic partial shearwalls improvements.
to obtain final inspection for work approved under pa#: 201305086458. all work is complete.
recommencement and completion of work under pa#: 201712015281.
unit 2005. 3rd flr: remodel kitchen and bathroom. relocate bedroom and 1 full bath. roof alteration on 3rd flr.
to comply w/ nov# 202534271, fix fire damage area at south side roughly 300 sqft of siding and framing. kitchen & bathroom remodel, everything stays in same location.