216 issued permits in Pacific Heights, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
216 permits
revision to 201812107916: relocate residential elevator door, add windows to rear facade no visible from st.
1st floor ti: for design professional space, converted from retail with accesable entry and bathroom.
new retaining wall and fence at rear property line to replace existing failing wall
addition and interior alts: 2-story rear yard addition. remodel to (e) kitchens and bathrooms. new bathrom on 1/f & 2/f. structural changes to basement only.
replace in kind remodel of 2 bathrooms.
to obtain final inspection for work approved under pa 202402276622, 202403288835,202405202428. all work is complete.
reroofing replace 1100 sq ft, no hot works
re-roofing: remove old roof, install 1 layer of nail base underlayment, install 1 layer of modified bitumen self stick new flashing, no hot work.
recommencement and completion of work approved under pa#201906072887, 202407307554, 202501309364
recommencement and completion of work approved under pa#201906072888, 202407307555
replace side gate with new wood gate.
ref pa 202507251625 add 500 sf conditioned space; relocate 2nd fl kitchen to 1st fl; add bathroom
removal of (e) winding stair & extension of 3-flight stair from 2nd flr of the dwelling unit to 3rd flr. relocation of (e) laundry on 3rd flr to new location, new layout for bath 2…
ref pa 202507251625 reduce 1st fl conditioned area to 163 sq ft. new bedroom
unit #1: replace kitchen cabinets & countertops, replace bathroom cabinet & tile, all in kind, repair flooring & paint. update plumbing and electrical.
reshape two front facade arches, patch exterior finish to matching existing
revison to pa #202510288279. revision at restroom for site conditions that revealed a sump pump that needs to remain with access. documentation of existing transformer and panel to…
unit #101: kitchen and bathroom remodel. rehang drywall 5/8" type x gyp. bd. and paint throughout the unit. replace flooring throughout the unit.
to obtain final inspection for work approved under pa#201603020977
recommencement and completion of work approved under pa#202410022162