143 issued permits in Russian Hill, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
143 permits
as built to pa# 202403198139: a low frequency removed. the elevator checklist revised. shunt trip has bene removed from elevator/machine room. 4 repeater removed. sequence of opera…
to obtain final inspection for work appproved under pa# 202411134937. all work is complete.
rear dwelling reroofing no sheathing replacement no hot works. remove all existing composition shingles roof membrane. install nnew galvanized roof flashing, roof jack vent, and ve…
to obtain final inspection for work approved under pa#: 202012090580. all work is complete.
kitchen remodel in-kind: cabinets, counter tops, appliances. remodel 3 bathrooms in-kind: 3 new shower pans, 1 bathtub, 3 vanities, 3 toilets, shower valves, no lay out changes, no…
fl:1 - legalize (e) studio apartment unit 12 (adu to be legalize under state adu program)
1.basement demo insulation drywall in one room (ceiling & wall). 2.1st floor demo drywall insulation on ceiling and wall. 3. 2nd floor demo drywall on hallway walls,demo floor in h…
unit c: 1) rehabilitate existing kitchen, 2) rehabilitate existing bathroom, 3) install washer and dryer. 4) no removal of structural walls.
installation of an anchored meas system for a bedrock cut slop failure along the northern property line(chestnut street)
unit#27: rehabilitate existing kitvhn & bathroom; install washer & dryer
addressing permit only: purpose of this permit is to create the address 1310 filbert st. link to apn 0524/009. ref pa # 2018-0502-8002
to obtain final inspection for work approved under pa#'s 202301311124, 202408209106, and 202406184763. all work is complete.
installation of 81 tiebacks along east side of property line for foundation work at 825 francisco street. reference bpa 202510066774 if needed.
interior remodel of 2 unit buidilgn including (n) kitchen and bathrooms, replacing windows and exterior finish on rear (south elevation) of building, lowering lower level slab and…
unit 6e: replace finishes in powder room, replace kitchen counter tops and faucet, paint cabinets, replace kitchen lights, add recessed lights in three bedroooms, relocate electric…
3rd fl: 333: a single office is being converted into 2 smaller spaces. new full height non load bearing partitions being added. an existing sink cabinet is being replaced with new.…
revision to pa 202603258301 (structural revision), 201607293726-s1 (site), 202403137746-s1 (altered site) structural revision to pages 3, 4 and 11
revision to pa# 202510016490: revise the design of the new concrete retaini9ng wall to one with spread foundation instead of deep piers.
interior remodel of 2nd/f unit, demo & replace center living room post, demo & replace both bedroom closet walls & doors, remodel of e) interior space including kitchen & both bath…
unit #2: remodel (e) bathroom - replace (e) shower, sink & toilet w/ new shower, vanity & sink and toilet, tile walls and floor, replace light fixture bring bathroom up to code inc…