408 issued permits in West of Twin Peaks, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
408 permits
1/f: add 2 bedroom, 2 full bath, laundry and family; 2/f: remodel kitchen and bathroom, add 1 full bath. infill at rear.
revision to pa #202507312085 (ref pa #2025-1212-1705): 1st fl- add rear deck & replace window with sliding glass door. 2nd fl- minor reconfigure bathroom and kitchen layout.
reroofing no hot work
solar permit: installing 15 solar pv modules, 440 watts per module, total no. of rating 6.6 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 15 kwh each in ca…
new site retaining wall to address complaint 202419761. no alteration to (e) house or garage structure.
reroofing 2200 sq ft, no hot works, no resheet
re-roofing w/ hot works
remodel kitchen and bath. replace roof ove porch in lightwell. no exterior work visible fdrom street, no expansion of building envelope.
remodel kitchen - new flooring, cabinets, recessed lighting; paint. remodel bathroom + shower - make tub in bathroom a shower/tub combo. upgrade (e) panel from 150 amps to 200 amps…
permit is seaparate from 202507181160: exploratory demo of upper & middle floors.
reroofing with hot works. customer stated that the owner had this done in nov 2025 but is still having issues with the roof.
reroof 1800 sq ft tile lift up, install underlayment, then place back existing tiles. 500 sq ft tear off install modified bitumen. hot works permit #126727
rewater proofing a window with some possible framing dryrot to be addressed also. this work is to take care of complaint #202651857. not to comply with ces #202649902
interior remodel of (e) first floor room to remove non bearing wall and construct (n) non bearing wall
main level: int. remodel, 123 sf horiz. add., demo (e) wd. deck, (n) wd. deck/str. lower level: excavate and convert (e) basement to (n) 1,111 sf attached adu under local code; (n)…
revision to pa #2026-0205-5301: remove (e) wall between the bedroom & sunroom. update structural detail for raised ceiling at bedroom #2
b/l #1: relocate e) stair & add wall btw storage & crawl space.1/f add 2 bedroom & 1 bath, relocate e) stair from g/f to basement#1, add a deck. 2/f: add a n) deck, remodel e) kitc…
exterior staircase replacement (like for like)
remodel (e) bathroom, replace fixtures. install new tile, vanity, exhaust fan and finishes. no structural changes.
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).