402 issued permits in West of Twin Peaks, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
402 permits
reroofing no hot works
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
solar permit: installing 15 solar pv modules, 6 watts per module, total no. of rating 0.09 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in c…
re-roofing (no hotworks)
revision to pa 202601234425, 202602105600 this revision consists of adding drainage to the project as shown on sheets 2.1. we are also doing 10 ft extra foundation replacement
convert part of garage into condition space to include (n) bedroom, bathroom, and laundry room. add a window in place of the garage door. curb cut reduction under dpw permit.
non-structural master bath remodeling: replace sink, toilet, tub, remodel existing shower. guest bath remodeling: replacing sink, toilet, remodel existing shower. no change to floo…
in kind repairs, to single family dwelling due to water damage, no change to layout or square footage, all repairs are interior to cabinets, flooring, finishes, 1 kitchen, 2.5 bath…
remodel kitchen and powder room
interior remodel to existing kitchen, dining, family and bathroom
front stairs: repair less than 50% of entry stairs dur to dryrot,remove existinf finishes and replace compromised stairs. back stairs: dryrot repair less than 50% repair of stairs.…
to obtain final inspection for work approved under pa# 202302222415, 202307142243, 202306029130. all work is complete.
solar permit: installing 13 solar pv modules, 440 watts per module, total no. of rating 5.72 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 13.5 kwh each in…
rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existin…
revision to 201805108746. voluntary seismic work at front of house along gridlines 4 and 5 removed from scope of work.
floor replacement in bathroom. in-kind bathroom remodel. fixtures, plumbing.
remodel lower level bathroom in kind, no wall removal or change of fixture locations
remove (e) shower, create new laundry closet on 1/f. remove and relocate (e) laundry on 2/f. remodel and extend bathroom on 2/f.