Renovation Permits in San Francisco, California
4,052 renovation permits filed recently
4,052 permits
replace the f/a system to meet the ca/sf 1106.3.71 and add the lf sounders insides of the units and wireless monitoring.
1/fl- remodel bathroom closet, remove 1 window and relocate . move no load bearing interior wall. add recessed lights and relocate utlitliy sink.
to comply with nov#202548792, master bath remodel, new toilet and vanity replacing old in 2nd bath interior work only
repalcement of the fire alarm system to the sf/ca code interpretation 1103.6.7.1 and wire in the lf horns insdie of the units and wireless monitoring.
unit 7: 2/f. 1. rehab existing kitchen, rehab existing bathroom, install washer and dryer. no removal of structural walls.
4/f: kitchen remodel. 3/f: kitchen and bathroom remodel. 2/f: kitchen and bathroom remodel. g/f: see structural drawings. no change in building envelope and not adding sq.ft. no exterior work.
unit #4: relocate (e) kitchen, living & bathroom. add one bedroom at unit 4 3rd fl
scope of work 7th fl (ste 750) shall consist of interior demo of non structural elements including interior partitoins, doors, finishes, ceilings, lighting,mech and elec outlets/switches. restroom ada...
40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas
relocate (e) kitchen, bathroom. add1 new bathroom & re-built interior stair at 2/f. construct 1 bedtoom, 2 full bath, family room, & install wetbar at g/f. construct new deck w/ staircase at rear of h...
14th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking foun...
12th fl: ti. demo of non structural elements, new interior partitions, doors, finishes, ceilings, lighting mech, elec outlets & switches, restroom ada access, upgrades for new ada hi low drinking foun...
11th fl - install consists of intallation of life safety and seismic requirements for new 1 person phone booths in an existing office, total of 7 phone booths. restrooms accessibilty upgrades are incl...
obtain final inspection for work approved under pa# 201811065207, 201901170569, & 201907105473. all work is complete.
existing fire alarm system in an (e) residnetial building. new control panel & notification devices are being installed along with (e) initiation devices, in compliance with sffc 1103.7.6.1. installin...
unit #6: convert (e) dining room to bedroom. rehabilitate (e) kitchen. add second bathroom. install washer and dryer.
14/f suite 1460: t.i includes demo of non-structural partitions and build new non-structural partitions. all mep work will be fully engineered and included in this permit. all life safety work will be...
remodel e) facial room and mezzanine floor. construct (n) bathroom ground/f. construct (n) add shower at ground/f. construct (n) storage at mezzanine. construct 2 new facial rooms at g/f.
to obtain final inspection for work approved under pa # 202011058323. all work is complete.
recommencement and completion of work approved under pa # 202104017763, 202307242833.