addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony.
revision to pa# 202601023189: as-built, change to scope-ceiling removed from front end area.
new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129
replacing sections of retaining wall.
convert garage into habitable area to include bedroom, family room, bathroom, and wetbar. no structrual work.
floor 4 to 7: upgrading the finishes to existing elevator lobbies. 1st floor: replacing floor finished and installing new shower glass doors in existing restrooms. for general building accessible upgr...
foundation repair at existing single family residence. no change to building footing or layout.
to obtain final inspection for work approved under pa#202211186847
addition & renovation to main home w/ new bathroom and bedrooms added. renovation to apartment including partial renovation of kitchen & bathroom.
installation of new 1.6k amp switch gear to pwoer 25 40 kw level 3 dc fast chargers for schoolbus fleet.
1 kitchen and 1 bathroom remodel, new cabinets, sinks, appliances, fixtures.
basement - set of document is for construction of an mep equipement platform avoce the existing parking access ramp
suite 108b. heating and cooling system. ref pa# 202603207998.
install new mechanical heating & cooling systom for 1st & 2nd fl, ste 100 & 200. fan coils weight 67 lbs, condensing unit 775 lbs. ref arch pa# 202602266554
revision to pa# 202512182161: to remove the kitchenettes from cope of work at the first floor, mezzanine, and 2nd floors.
revision to pa# 202507251594, ref pa# 202511149647: foundation revision.
replace handrail down to basement, stop leak at exterior stairs, facing the street
remove work station, install pre-sink. remove (e) 2'x2' tie car ceiling w/ new & replace partial wood flooring in dining room area. all work at g/f.
amendment to 202603278437 show joist attachement to slab. show location of pony walls and detail construction, show reconfigure laundry area.
unit #6: balcony repair inkind, blacony size 10x5.3. new 4x12 pressure treated, new 2x8 pressure treated, new 2x6 redwood decking. metal hangers. will keep existing metal handrail