Renovation Permits in San Francisco, California
4,052 renovation permits filed recently
4,052 permits
replace (e) bi-directions amplifier (bda) in (e) errcs & add remote shut off to comply w/ sffd & dept of technology guidelines.
recommencement and completion of work approved under pa# 202107275180
revision to pa# 202509175525 and 202601306967: enclose lightwell. 2/f - reconfigure kitchen and deck layout. 3/f - remodel 1.5 baths.
comply w/ 202302734: to legalize deck construction 10' x 5'. replace patio door kind in kind, replace window kind in kind.
to obtain final inspection for work approved under pa#202103186807. all work is complete.
unit #102: rehabilitate existing kitchen, rehabilitate existing bathroom, install washer and dryer. no removal of structural walls.
unit #5: revision to pa# 202601133715, install washer/dryer in kitchen.
unit 301: master bath change shower tub to walk in shower, hallway bath increase room size, relocate vanity freestanding tub & sauna, kitchen like to like, no exterior work
replace pre-existing errc's original install ref pa 201312093691(6)
bathroom remodel: replace like for like shower, vanity and toilet.
unit #320: one kitchen and one bathroom remodel in-kind, like for like.
rebuild the upper balcony in-kind due to dry-rot damage in the rear of the building, no change in size of balcony
unit #2: remodel (e) bathroom - replace (e) shower, sink & toilet w/ new shower, vanity & sink and toilet, tile walls and floor, replace light fixture bring bathroom up to code including ventilation....
to comply w/ nov# 202315728: legalization of (e) storage sheds. sheds are 75 years old or more.
as builts for permit # 202511048856 - for fire sprinkler system and underground.
repair dry rot within the 1st and 2nd floors, and walls @ the west side of the building. ref siding permit bldg-26-218
revision to permit # 202604018706 . add flextend location.
removal of 27 (e) parking stall stacker equipment
revision to 202305268680: update window locations at the shared access alleyway, a new garage man door at western front facade, update heating system from hydronic to ductless mini split units
revision to 202change of wall type at a demising wall 15th fl