Renovation Permits in San Francisco, California
4,052 renovation permits filed recently
4,052 permits
install new 6-ton fan coil to serve existing computer room. no exterior work.
provide new bedroom, new bathroom and media area at existing level 1 garage and storage area. new interior stair from level 1 to level 2. minor interior remodel at level 2 living room.
9th fl - fire only work for the phone booth additions on floor 9 under pa 202506178881. additions are strobes
suite #100: will be provided with notification appliances throughout per code. new horn/strobes & strobes will be tied to the existing power supply bps/10a spec. suite # 200:will be provided with noti...
remodel 1 existing bathroom. no structural work or layout changes. no wall modification.
to obtain final inspection for work approved under pa#: 202406134435. all work is complete.
recommencement and completion of work approved under pa# 202104027779.
to obtain final inspection for work approved under pa # 202206065681. all work is complete.
to obtain final inspection for work approved under pa # 202206065686. all work is complete.
basic kitchen remodel in-kind. repair and replace cabinets, countertops, appliances, sink and lights.
remove existing exterior stairs and handrails and construct new exterior stairs with new stringers, treads, risers and well mounted handrails.
unit #280 fl 2: renovate kitchen, reconfigure/relocate powder room & bathroom to 2 full bathrooms. (interior remodel / no visible exterior changes from street)
recommencement and completion of work approved under pa 202205184504.
to obtain final inspection for work approved under pa 201609066801. all work is complete.
demo 733 sq ft of shingles and install 735 sq ft of shingle, hot work.
3,5,6,7,8th/f: identical t.i. new men's/women's restrooms, kitchenette/snack for office use only. interior work only
remove non structural office partitions. remove drop ceilings. remove floor finishes. building remain vacant under ab-017
remodel 1 existing bathroom on 3/f.
revision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging...
2x bathroom remodel to include replace (e) switches, plugs, fixtures with new fixtures, no wall removal or layout change. all like for like