41 issued permits in Midtown Phillips, part of Minneapolis, Minnesota. Refreshed every 6 hours from the city's public permit feed.
41 permits
Installation of a 40K BTU Goodman furnace for unit #1, installation of a lift pump.
(24.5 SQ) Material Selection: Provia Hearttech D4 Antique White SCOPE: Full House Siding
Addition of (x11) Overflow Roof Drains and a corresponding Secondary Storm Drainage System within the Allina TAF Facility
ALTER ROOF DRAIN SYSTEM 2020 MSBC architect: 53825 - Abeln, Daniel Jonathon @ EAPC engineer: 61683 - Wuollet, John Christopher @ MBJ
Replace boiler
Replace water heater
Reroof -ACW certificate of occupancy required no special inspections required no 2020 MSBC
Convert existing single-family dwelling to r3 assisted living facility certificate of occupancy required - an authorized representative of the permit applicant must call 612-673-23…
Replace 3 pieces of gas equipment with new equipment: 1 griddle with gas range, 24" gas restaurant range, 1 Vulcan deep fryer, freestanding All gas piping and appliances shall be i…
reside house only
Reroof house and garage; redeck house only
FOOD open arms. grease duct for oven replacement oven
Repipe water only - one bath/kitchen/laundry
REPLACE 6 WINDOWS & 1 DOOR WINDOW REPLACEMENT This permit authorizes the removal and installation of _6_ windows. 1. For one- or two-family dwellings, windows installed under this…
Updating the Abbott Northwestern TAF and Main hospital west Building Data closets with new technology on 2nd and 3rd floor. Work includes Electrical and HVAC (Rooms 2903M, 2905M, a…
Replace Gas Dryer
Abbott northwestern piper building and main east building data closet upgrades. work to be done on 2nd, 3rd, 6th floor. see pages "level 02 life safety plan", "level 03 life safety…
Duct alterations to data room K2 through K8. Adding 2 owner CRAC units.
Wall braces in basement. wall panels. if foam insulation is placed behind wall panels, thermal barrier required per section r316.4 (jjl) engineer: stark foundations - roman stead #…