349 issued permits in Concourse-Concourse Village, part of Bronx, New York. Refreshed every 6 hours from the city's public permit feed.
349 permits
Proposed replacement of air handling units and piping. All as per plans filed herewith.
Plumbing fixture build out for tenant museum space. Filed in conjunction with HUB NB #210179929. (Hub consultation 9/5/24. S Pavan Ok to assign to S Linehan examiner)
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Replace boiler and gas/oil burner. run new oil lines from oil tank in 923 walton avenue to boiler in this building.
Boiler to be removed. cancel boiler # 2263-01. change grade of oil from #4 to #2. run new oil lines from existing oil tank in 923 walton ave to replacement boiler in 911 walton ave…
Foundation plans filed in conjunction with gc application x01255412-s2
filing for interior renovation as per plans. No change to use, egress or occupancy.
Erect illuminated accessory business wall sign reading luxury recliners
Construction fence filed for this project
Erect illuminated accessory business wall sign reading hibachi grill buffet
Erect illuminated accessory business wall sign reading r logo regal
This application is being filed for general construction & structural work to renovate & repair existing fire damaged building. work to be performed at cellar through fourth floor.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Install a new sprinkler system for the renovation of the laundromat.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Replacement of existing parapet walls on the roof, repair building facade, and replacement of (4) windows at the front facade. no change in use, egress, or occupancy.
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
Installation of new fuel cell generating system with auxiliary equipment. New mechanical exhaust system. Related Alt I #220742926 approved by DOB accordingly.
Soe filing in conjuction with nb application hereby submitted to construct 13-story mixed-use new building with inclusionary housing as per filed plans.