360 issued permits in Clinton Hill, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
360 permits
Installation of pipe scaffolding during new building construction as per plan and in accordance with Chapter 33 of NYC Building Code.
Corrective work at 2nd & 3rd floor Class A residential apartments to resolve HPD violations as per plans filed herewith. No change to use, egress, or occupancy under this applicati…
1. install 2 new doors in the 2nd floor as per plan.2. create a new opening in the 2nd floor as per plan.3. remove exist. interior door and close with new wall as per plan.
Application filed herewith to Combine two dwelling units into one under TPPN 3/97 with NYC DOB Required for Final inspection. PL Work will consist of removal and installation of ba…
Suspended Scaffold installation and hoist as per plans filed herewith. No change in use, egress and occupancy.
Work to the basement and 1st floor of an existing 2-family, 4-story + attic building. alterations to include the creation of a new stoop & door opening at the front facade to match…
General Construction and Structural work to repair and replace damaged roof joists & repair existing roofing at the garage only to rectify ECB Violation #39158828N No change in use…
Application to reconfigure Unit 11B and 11C on 11th floor, interior renovation in Unit 11C. Partition work as per plan. No change in use, occupancy or exit.
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment.
Interior and exterior church renovation including roof, windows work, and new elevator as per plans filed herewith. no change to use, egress, or occupancy.