1,319 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,319 permits
Renovation of public hallways in res. 5 sty bldg: replace flooring, int. lighting, apt doors, paint. Repair and resurface exist. facades, scrape & paint exist. fire escape. No chan…
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Demolition of roof tanks, installation of new sprinkler booster pump system, and modification to existing automatic sprinkler system.
Installation of Temporary plywood enclosure for site-specific engineered enclosure system as per BC 2022 Chapter 33 Section 3309.17 as the alternative to the adjoining property pro…
Tenant improvement for new five iron golf at cellar & 1st floor tenant space as per plans filed herewith. no change in occupancy, egress or exit. modifications to tenant space incl…
Interior fit-out of existing residential unit 1g proposed. install new plumbing fixtures. no change of use and occupancy under this application.
Interior fit-out of existing residential(floor 1) unit 1g proposed. remove and install non-bearing partitions, install mini-split air conditioning unit. no change of use and occupa…
Interior renovation at 2nd, 3rd and 4th floors of existing commercial building to facilitate Stair Installation & Slab Infill. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Filing for interior renovation of unit PHA (11 and 12th floors), including new gypsum board work. Mechanical and Sprinkler work to be filed separately. Mechanical work under M01334…
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Interior removal of non-load bearing partitions on cellar, floors 1 through 4, as shown per plan. no change in use, egress or occupancy.
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.