1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Illuminated non-advertising accessory wall sign - utopia bagels. no change of use, egress or occupancy.
Installation of temporary roof protection, overhead protection and window protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in…
Pl work filed in conjunction with dob now gc and mh. no change to use, occupancy or egress.
Filing for mechanical work associated with interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submtted herewith.
Filing herewith drawings indicating sprinkler modification to existing systems. No change in use, egress or occupancy.
Hereby filing installation of interior millwork on partial 33rd floor and document new place of assembly spaces as per drawings filed herewith.
At 28th floor tenant space, modification to existing mechanical system as per plans filed herewith. no change to occupancy or means of egress.
Plumbing work as shown on plans filed herewith.
Filing for interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submitted herewith.
Mechanical work filed in conjunction with the renovation of existing dwelling unit as per plans. No change of use, occupancy or egress.
Modifications to the existing Standpipe System; Relocation of two (2) Fire Hose Rack and Fire Hose Valves and associated Fire Standpipe on the 3rd Floor as per plans (Wafra Inc. -…
Filing for mechanical systems modification for interior renovation.