1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Modifications to the existing plumbing system on Floors 33, 34, 35, 36 (Kirkland & Ellis) as per plans. No change to use, egress or occupancy.
Parking garage repairs. no change in use, egress, or occupancy
Installation / modification of plumbing fixtures, installation of new sprinkler heads and related piping for proposed renovation of restaurant in cel, bas, 001-002 as shown on plan…
Renovate 1 bathroom with fixtures in new locations, Renovate 1 bathroom with fixtures in existing locations. No change in use, egress, occupancy or floor area.
9th cycle FISP repairs. No change to use, occupancy or egress.
Modifications of existing sprinkler system to accommodate new work as per plans. No change to use, egress or occupancy.
Mechanical work as per submitted plans. no change to occupancy/use, egress, or fire protection under this application.
Mechanical miodification to existing retail space on bas level (dumpling shop). no change to use occupancy or egress.
Removal and installation of plumbing fixtures and associated piping for the 20th floor office space as per plans. no change to use, egress or occupancy.
Modifications to the existing sprinkler systems (Phase 1- Soft Demo) as per plans. No change to use, egress or occupancy.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Masonry facade repairs as per plans. No change in use, egress or occupancy.
Wcm interior 4 plumbing and sprinkler modifications to accommodate the clinical practices renovation in the existing building. no change to use, egress or occupancy.
Plumbing fixtures installations in conjunction with General Construction work under Initial Filing M00954652-I1 Subdivide apartment 6ABC into apartments 6A, 6B, and 6C to restore e…
Modifications to plumbing system on 12th floor partial as per plans. No change in use, egress or occupancy.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Partition work on the 29th floor to create place of assembly with increase of occupancy load on the 30th floor (Tradeweb) as per plans.