1,189 issued permits in Financial District-Battery Park City, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,189 permits
IRA Rope Access Facade Inspection
Application filed for sprinkler modifications/additions on the 7th floor (suite 724) as per plans filed herewith. no change in use, egress, or occupancy.
Filed herewith for sprinkler modifications for a commercial restaurant fit out of existing retail space. no change to use, occupancy, or egress.
Seven non-illuminated non-advertising accessory awnings for the wall street hotel - no copy. no change of use, egress or occupancy.
Application filed for plumbing modifications/additions on the 7th floor (suite 724) as per plans filed herewith. no change in use, egress, or occupancy.
Filed herewith for plumbing work fit out of existing retail space in conjunction to m01344532-i1. no change to use, occupancy, or egress.
Sixteen non-illuminated non-advertising accessory awnings for the wall street hotel - no copy. no change of use, egress or occupancy.
Eight non-illuminated non-advertising accessory awnings for the wall street hotel - no copy. no change of use, egress or occupancy.
Facade Restoration
Relocate and provide new sprinkler heads on existing system in existing office space on 10 fl in conjunction with alt #m01349048 as per plans filed no change in use occupancy or eg…
Installation of suspended scaffold for facade work or inspection.
Erect new non-bearing gypsum board demising partition withing single existing bedroom to create two bedrooms. exyend existing ductwork to new bedroom. no change in use, egress or o…
General Construction taking place on the 41st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Proposed installation of temporary pipe scaffold stair tower as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress…
Installation of temporary roof and overhead protection protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Proposed interior renovation on the 53rd floor including partitions. all as per plans filed herewith. no change in use, egress or occupancy.