620 issued permits in Gramercy, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
620 permits
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Alteration Type 2 to combine two units on the 2nd floor as per TPPN 3/97 and renovate the apartments on the basement and 1st floor . All work as per plan. No change in use, egress,…
Sprinkler modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy.
Installation of new heating and cooling equipment
M040_Scope of work to repair roof and exterior masonry. Provide flood elimination. Remove and replace parapet, windows and window guards.
Removal of existing non- bearing partitions, ceiling, and millwork for Bank of America. No change to use,egress, or occupancy.
Alteration 2 to combine two units on the 3rd floor as per tppn 3-97. all as per plan. no change in use egress or occupancy
Temporary Construction Fence
Plumbing modifications taking place on the 9th floor as per plans filed herewith. No change in use, egress or occupancy.
Filing for exterior work on roof and north and south facades. No change in use, egress, or occupancy.
Replace existing sump pump and provide new floor drains.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Herewith filing mechanical modifications for Inpatient Unit, NYU Langone Orthopedic Hospital. No change in use, egress, or occupancy.
Installation of supported scaffold for access to work locations. no change in use, egress or occupancy
Installation of suspended scaffold for facade work and / or inspection. Amend #2 added hoist
Herewith filing general construction modifications for Inpatient Unit, NYU Langone Orthopedic Hospital. No change in use, egress, or occupancy.
Sprinkler modification work on the first floor. no change to use egress or occupancy.