646 issued permits in Greenwich Village, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
646 permits
Installation of temporary heavy duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or…
Interior renovation of existing apartment 13f as per plan. modifications to doors, partition, millwork and floor. no change in occupancy, use and egress.
Removal of existing interior non-load bearing partitions, floor and ceiling finishes in existing building in the cellar, basement, first through third floors. No change in occupanc…
Material hoist
Provide temporary dry standpipe (in vacant building) & fire department connection using existing building standpipe riser. filed in conjunction with building renovation application…
Facade restoration, inspections
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Propose minor plumbing at existing apartments 17 & 20 on the 4th floor, as per plans submitted herewith.
New plumbing fixtures as per plans for Mezzanine lounge area and 1st Floor Cafe. New & relocated sprinklers heads as per plan.
Interior renovation of existing apartment 3f & 15b as per plan. modifications to doors, partition, millwork and floor. no change in occupancy, use and egress.
Proposed installation of new Cellar and 1st floor toilet exhaust duct and fan and replacement of compressors and existing outdoor condensers, and obtain the EUP. No change to use,…
Filing herewith application for sprinkler modifications. No change in use, egress or occupancy.
Installation of new: (1) shower, (1) toilet, (2) lavatory, (1) kitchen sink, (1) dishwasher. remove/cap 25 lf gas piping for existing gas range.
Plumbing modifications to existing apts# 7B and 17A as per plans.
Plumbing work associated with renovation of 2-family dwelling.
Plumbing work filed in conjunction with the renovation of an existing duplex penthouse as per plans. No change of use occupancy or egress.
Plumbing modifications to existing apartments # 12 A, 14B and 16EF as per plans
File suspended scaffold outrigger systems for facade restoration and inspection.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of suspended scaffold for facade work or inspection.