1,680 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,680 permits
Application being filed to show interior alteration of existing office space on the 4th floor as per plans filed herewith. Work to include partitions, doors, and minor modification…
Modification to existing plumbing fixtures and sprinkler system as per plans filed herewith. no change in use egress or occupancy.
Facade repairs as per plans filed herewith. no change, to use, egress or occupancy.
Modification of existing sprinkler system as per plan. no change to use, egress or occupancy proposed. filed in conjunction with 110366443, m01330947, m01330949, m01328048
Proposed renovation of existing kitchen and bedroom hall closet.
Modification to existing hvac system as per plans filed herewith. no change in use egress or occupancy.
Modification to existing Sprinkler system (connecting new sprinkler heads to existing branch piping) as per plans filed herewith. No change in use, egress or occupancy under this a…
Renovation of interior partitions on 2nd floor as per plans
Modification of existing sprinkler system on the 1st floor pet shop, asshown on plans. no change in use, occupancy or egress.
Plumbing work on the 17th floor (Ownership Works expansion) as indicated on drawings.
Structural work as shown on plans filed herewith. No change in use, egress, or occupancy.
Installation of new shower and replacement plumbing fixtures
Interior renovations to pet shop on 1st floor. no change in use, egress, or occupancy.
Herewith filing for mechanical ductwork modification on 3rd floor as per plans filed herewith. no change in use, occupancy or egress.
Herewith filing for interior renovation of 3rd - 5th floor as per plans filed herewith. no change in use, occupancy or egress.
Minor modifications to natural gas piping to bring boiler room up to code.
Modifications to existing sprinkler system at the 3rd floor as per plans filed herewith. No change in use, egress or occupancy.
Removal and relocation of existing fixtures to proposed locations.
Plumbing work filed for installation of new drinking fountain on 13th Floor (Construction)/14th Floor (Marketing).
Filing for sprinkler work at the 2nd floor. No change to use, egress, or occupancy.