1,679 issued permits in Midtown South-Flatiron-Union Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,679 permits
Installation of suspended scaffold for facade work or inspection. amend #8, added scaffold drops
Plumbing modifications taking place on floors 2, 4, 5, 6 as per drawings filed herewith. no change in use, egress or occupancy.
General construction to renovate existing apartments at the 1st thru 4th floors. work will include new partitions & finishes, and new plumbing fixtures. no change in use, egress, o…
General construction modifications taking place on floors 2, 4, 5, 6 as per drawings filed herewith. no change in use, egress or occupancy.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Replacement of existing louver on the 81st floor in an existing window frame. No change to egress use or occupancy
Sprinkler work on the 20th floor (Petfolk) as indicated on drawings
Removal and installation of sprinkler heads and related piping including TCSP loop for existing office suites. No change in use, egress or occupancy.
Erect non-illuminated accessory business wall sign for pandora
Sprinkler work on the 20th floor (restrooms) as indicated on drawings.
Construction work on the 20th floor (corridor) as indicated on drawings.
Plumbing modifications taking place on the 9th floor (9KN) as per plans filed herewith. No change in use, egress or occupancy.
Install standpipe as per plan, application is in conjunction with nb application bis#121186448,no change in egress,occupancy,and use
Interior modifications in suite 1510 (liminal) on the 15th floor. includes removal of select existing ductwork and mechanical components, installation of new hvac distribution and…
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this app…
Herewith Filing Modification to existing Mechanical System as per plans.
Application filed for plumbing additions/modifications on the 10th floor (suite 1002) as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of medical office on 7th fl as per plans filed herewith. no change to use, egress or occupancy
Structural work associated with reinforcement of sidewalk framing and replacement of sidewalk flags. no change to use, occupancy or egress