775 issued permits in Tribeca-Civic Center, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
775 permits
Modifications of existing mechanical system, add energy recovery unit to provide outdoor air, and add residential kitchen and laundry exhaust system
Renovation of existing unit PHA to include removal & installation of partitions and stair. No change in use, egress, or occupancy
Plumbing work in apt 8b as per plans. no change in use, occupancy, or egress.
Plumbing work in apt 10g as per plans. no change in use, occupancy, or egress.
Interior renovation of apt 11d. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Installation and use of temporary roof protection equipment as per plans filed herewith. no chance to use, egress or occupancy under this application.
Remove brick and install new lintel and waterproofing at 6th floor window header.
Interior renovation of apt 6l. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Facade repairs as per plans; no change to use, egress, or occupancy.
Blank street coffee-- general construction inclusive of partitions modifications for cafe build out as per plan filed. no change to use, egress, or occupancy.
Interior renovation of apt 10g. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Facade and Structural Repairs, no change in use, egress, or occupancy.
Propose to remove interior partitions, doors, and ceilings as shown on drawings
Application filed for facade repairs as per plan herewith in. no change in use, occupancy, or egress.
Modifying HVAC system to serve new configuration as per plans. No change in use, egress or occupancy.
Removal and replacement of partitions, lighting, fixtures, and finishes in units 6a, 6d, 6b & 6c. no change in use, occupancy, or egress.
Removal of existing convenience stair work to also include patch and repair of ceiling and floor finishes as indicated on plans. no change in use, egres or ocupancy.
Scope of work to perform interior renovation at the 4th through 6th floors and convert mezzanine into 7th floor. certificate of occupancy to change the use of the 6th mezzanine int…