2,105 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,105 permits
Apartment 14AB. Mechanical work associated with new layout of apartment per plans filed herewith. No change in egress, use or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Mechanical work: filing for the installation of split system for a/c and ventilation in apt. 3 on third floor.
Structural repairs to include the repair and reinforcement of existing structural members, as well as temporary shoring and replacement of fireproofing as shown on the drawings fil…
Modifications to existing plumbing systems. no change to use, occupancy or egress
Storefront modifications for new retail store- includes new entry door and security glazing
Plumbing work related to the interior renovation of apartment pha on the 13th and 14th floor and basement. no change to use, egress, or occupancy.
Interior renovation of apartment 4d. no change in use, egress, or occupancy.
Renovation of apartment 3 on the third floor. partition changes and renovation of kitchen, reconfiguration of bathrooms and new laundry room. new fixtures and finishes throughout.
Kitchen and Bathroom renovation
Interior renovation of existing apt unit 3E and 3F on 3rd floor to install non-load bearing partitions and finishes in conjunction with Alt-1 application 120597540.
Apartment 14AB. Install new non load bearing partitions, flooring, ceilings and finishes per plans filed herewith. No change in egress use or occupancy.
Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No ch…
Herewith filing for plumbing modifctaions in units 8j and 16c as per plans. no change to use, cocuapncy or egress.
Application filed for minor interior renovation of an existing beauty shop on the third floor as per plans submitted. no change in use, floor area, egress or occupancy.
Proposing Construction Fence on sidewalk during storefront work.
Plumbing work proposed for a single family home. No change to use, occupancy or egress.
Modification of sprinkler system as shown on plans