2,107 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,107 permits
Mechanical work associated with the renovation of an existing bathroom and bedroom. no change to use, egress of occupancy.
Propose interior renovation of unit 8K. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or oc…
Removal of all existing sprinkler heads and piping and installation of new full building coverage sprinkler system designed to nfpa 13 requirements. no change of use, occupancy or…
HEREWITH FILE PLANS TO COMBINE APARTMENTS 31A AND 31B, per TPPN 3/97, RELOCATION OF GAS COOKING APPLIANCE AND PLUMBING FIXTURES, filed in conjunction with general construction. (to…
Subsequent application filed for plumbing modifications/additions as per plans filed herewith. this application will supersede application # 100485379
Installation of temporary audience seating riser & performance platform.
Application hereby filed for temporary construction fence during construction operations in conjunction with GC application no. M01250485-I1
Installation of pylwood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Install (38) new heads, (1) jockey & (1) booster pump on the Cellar, (33) heads on the 1st Floor, (25) heads on the 2nd Floor, (48) heads on the 3rd Floor and associated Sprinkler…
Application filed for plumbing work, as per plans. no change to use, egress or occupancy.
Plumbing with the renovation of existing duplex apartment #4 on the 2nd & 3rd floors. as per plans filed herewith. no change of use, egress, or occupancy.
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Proj…
Penthouse a roof replacement, roof drain replacement, railing restoration, divider replacement, and bulkhead threshold replacement. no change in use, egress or occupancy.
Renovation of ext'g tenant space - Chipotle. Work to include Storefront, Interior partitions ceiling, soffit, floor & wall finishes, equipment, Furniture,Graphics, new interior ram…
Proposed new fabric on existing awning structure. wording paola's 1302 no change in use, egress or occupancy.
Install new gas piping throughout building as per plans. no change in use, occupancy or egress.
Installation of (24) sp heads at cellar, (17) on 1st fl, (19) on 2nd fl, (18) on 3rd fl, (19) on 4th fl, (15) on 5th fl, (11) on 6th fl. installation of 56 plumbing fixtures.
Provide temporary core protection sprinkler system to protect jobsite while under construction. No change to use, occupancy or egress under this application.
Sidewalk Shed installation as per plans filed herewith.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code, no changess in use in egress or occupancy under this application.