2,107 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,107 permits
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicati…
Interior renovation consisting of removal and installation of partitions & doors, renovation of bathrooms and addition of powder room, replacement of kitchen fixtures & finishes, a…
Interior renovation of existing apartment 1e in the cellar level of 829 park ave - installation of new non-load bearing partitions, fixtures and finishes. no change in use, occupan…
Installation of suspended scaffold for facade inspection/repair.
Adding one sink, ejector pump and point of use hot water heater.
Replace existing storefront awnings. all copy on awnings filed under separate application # m00956135. no change in use, egress or occupancy
Filing for interior demolition of non-load bearing partitions and general construction of an apartment unit. No change of use, egress or occupancy.
Filing for mechanical renovations (PTAC, FCU and Air Cooled Heat Pump units) as per plans filed. No change of use, egress or occupancy.
This Alteration is being filed for the interior plumbing work on the Commercial space on the Basement level. There are no change in use, egress or occupancy.
Install non-illuminated copy on storefront awnings filed under separate application # m00956148. (flagstar)
Minor modification to mechanical system for apartment renovation.
The work shown in this drawing set focuses on the support of excavation for the construction of a new elevator at the existing cellar level at 1009 Fifth Avenue. Vertical rock cuts…
Plumbing work filed in conjunction with the apartment interior renovation as per plan. No change in use, egress, or occupancy under this application
Interior non-structural renovation of apartment #9g. replacement of cabinets fixtures, finishes, and lighting. no change in use, occupancy or egress.
Plumbing work proposed for an existing multi-use building. No change to use, occupancy or egress.
Installation of emergency heavy duty sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or…
Mechanical work filed in conjunction with the renovation of an existing dwelling unit as per plans. Architectural and plumbing work as per plans. No change of use, occupancy or egr…