2,107 issued permits in Upper East Side-Carnegie Hill, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,107 permits
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of new heating and cooling PTAC (6) units filed with associated applications M01159470-I1 M01159470-S2.
Installation of suspended scaffold for facade work or inspection.
Interior combination of apartment 10g and 10n on the 10th floor as per tppn 3/97. no change in use, egress or occupancy.
Propose to install new illuminated channel letters on aluminum raceway for existing commercial space. no change to use, egress or occupancy.
Interior renovation of Apt 6E & Apt 10E as shown on plans filed herewith.
Interior renovation of apt 3b on the second floor. no change in use, egress or occupancy.
File an non-dir Alt 2, scope of work includes removal of existing storage room for new tenant amenity exercise room. This exercise space is to be used solely by building tenants on…
Renovation of an existing apartment# 11W on the 11th floor. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress…
Slab repair at the parking garage level including installation of temporary shoring as indicated in the plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of apartment 9d at 9th floor: remove/replace non-bearing partitions, fixtures and finishes pl to be filed as a subsequent doc. no change to use, egress or occup…
Filing for combination of buildings 41 and 43. interior and exterior renovations, party wall openings and enlargement at roof for new bulkhead. work on floors sc1, cel, 01-06, rof,…
Apt 9D: relocation and installation of plumbing fixtures in Bath 914, bath 910, kitchen and laundry rooms, square footages for PL work: 196.8 SF total, filed in conjunction with ge…
Herewith filing for the interior renovation of one apartment in an existing 16 story, mixed-use building. no other work proposed under this application.
UNIT 14AM. Removal of plumbing fixtures to accommodate new layout. No change in egress, use or occupancy
Phase 3.2 s3: modify existing sanitary, vent, domestic water and gas distribution in conjunction with building alteration.
Propose interior renovation and combination of apartment 3A+F as per TPPN3/97. Removal and installation of non load bearing partitions and related finishes all as per plans herewit…
Remove (1) clothes washer and (1) gas range. replace (2) toilets & (2) lavs. install (1) new clothes washer & (1) new gas clothes dryer.
Replacement of existing package unit. no change in use, egress or occupancy.