591 issued permits in Upper East Side-Yorkville, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
591 permits
Mechanical systems installation for New Building #M00990455-I1.
Herewith filing for change of use, egress and occupancy for proposed life sciences building. horizontal and vertical enlargements of existing building.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of PV solar energy system on roof. No change of use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation of apt 1B and cellar. Demolition of non-load bearing walls. Installation of new partitions, new metal stair to connect apt 1B with cellar, new lighting, new kit…
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Filing herewith for the renovation and installation of new bathroom and kitchen fixtures .
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added anchor wall detail
Renovate existing apartment, partitions & doors. no change in use, egress or occupancy
Installation of swing stage suspended scaffold as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy
At apartment 5g, removal and installation of plumbing fixtures and connecting piping as per plans filed herewith. no change in use, occupancy or egress.
Installation and use of engineered enclosure system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. this work is associated with facade repair applicat…
Installation of outrigger for facade repair.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
pointing as per plan. no change in use, egress or occupancy with this application
Removal + relocation of non load bearing interior partitions as per plans.
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy