1,137 issued permits in Upper West Side (Central), part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,137 permits
Mechanical work is proposed in the existing unit PH601. Initial General Construction application to be filed. All per submitted plans. No changes to use, egress, or occupancy under…
Installation of temporary heavy duty sidewalk shed and pipe scaffolding as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the…
Interior renovation of cellar apartment (approximately 619 s.f.)no change in use, egress or occupancy.
Installation of a heavy duty sidewalk shed & medium duty pipe scaffold as per plans in conjunction with general construction work. no change in use, egress or occupancy. pipe scaff…
Install replacement gas piping as per plans. no change in use, occupancy, or egress.
Interior renovation of apartment. No change to use, occupancy, or egress.
Filing for interior renovation of apt 10/11c as per plans submitted herewith.
Suspended Scaffold installation and hoist as per plans filed herewith. No change in use, egress and occupancy.
Subsequent filing for mechanical work for cellar apartment as per plans filed herewith. no change in egress, use or occupancy.
Masonry replacement, repointing of mortar joints, window sill replacement, coping stone replacement, partial parapet replacement as per plans submitted herewith. no change in use,…
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Combination of two class A apartments. No change of use, egress or occupancy under this application.
Mechanical work as per plans for the cellar, Basement, first, second and third floor .
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Filing herewith for the interior renovation. partition changes to non-load bearing interiorwalls, general construction, and plumbing as per plans. no change in use,occupancy, or eg…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of new thru-wall AC units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy.
Relocation of existing plumbing fixtures and installation of new (approximately 600 s.f.) at cellar level apartment. no change in use, egress or occupancy.